Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2023

November 2, 2023

July 31, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$4,539,725.00

Public - County

img_map_placeholder

Multiple Locations, Boise, ID

Subscribe to View Full Documents

The work includes reconstructing Garden Street from Albion Street to Emerald Street including installation of 5-foot or 7-foot wide attached sidewalk on both sides of the roadway. The work also includes installing a Pedestrian Hybrid Beacon across Franklin Road at Garden Street; replacing bridge #1362 over the North Slough located approximately 120 north of Mason Drive; and installing bikeway signage and striping for the Garden Street Bikeway between Albion Street and the Greenbelt. All questions or clarifications concerning the content and requirements of the Invitation to Bid (ITB) must be posted in the Q&A section of the solicitation located at the eProcurement Portal. All questions or clarifications must be submitted by 12:00 pm on Monday, September 25, 2023. Project Number: 822022, 819007, 822021.002, 822021.001, 822019.002 GIS No: 204119 The right is reserved to reject all proposals or reject any proposal not conforming to the intent and purpose of the Contract Documents whenever such action appears to be in the best interest of ACHD. Question Deadline 09/25/2023 at 12:00 PM MT ACHD shall be entitled to Liquidated Damages of $2,500 The work includes reconstructing Garden Street from Albion Street to Emerald Street including installation of 5-foot or 7-foot wide attached sidewalk on both sides of the roadway. The work also includes installing a Pedestrian Hybrid Beacon across Franklin Road at Garden Street; replacing bridge #1362 over the North Slough located approximately 120' north of Mason Drive; and installing bikeway signage and striping for the Garden Street Bikeway between Albion Street and the Greenbelt. Bid Result. Schedule 1:Capital Paving Inc. $1,567,083.40 Schedule 2:Capital Paving Inc. $1,014,303.90 Schedule 3:Capital Paving Inc. $1,722,802.14 Schedule 4:LaRiviere Inc $228,710.50 Schedule 5:Capital Paving Inc. $4,326.00

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.