Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 10, 2023

December 11, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$550,000.00

Public - City

img_map_placeholder

Multiple Locations, Irving, TX

Subscribe to View Full Documents

The work to be performed under this contract was designed in two phases. Phase I is the reconstruction of pavement and utilities along Esters Road beginning at the City Right-of-Way adjacent to State Highway (SH 183) and going North to a point south of the Esters Road-Rochelle Road Intersection. Phase II includes work beginning at the end point of Phase I South of the Rochelle Road and Esters Intersection then extending to the North of the Twin Falls Street at Esters Road Intersection. The project includes the scope of work for the two phases complete and can be worked on simultaneously with approval of traffic control by the City of Irving The work to be performed under Phase I of this contract consists of furnishing all concrete, steel, appurtenances, tools, equipment, labor and incidentals necessary to install complete in place 6-Inch thru 20-Inch diameter Water Main, 6-Inch and 8- Inch diameter Wastewater Main, Removal of and installation of various size Reinforced Concrete Pipe(RCP), Storm Water Junction Boxes and storm water Inlets, Reinforced Concrete Sidewalks, 9-Inch Reinforced Concrete Paving, temporary ridding surfaces and traffic signal infrastructure at Rainier Street Traffic signal poles, lights and equipment will be provided and installed by the City of Irving), sod and irrigation, with all associated appurtenances to complete this project. The work to be performed under Phase II of this contract consists of furnishing all concrete, steel, appurtenances, tools, equipment, labor and incidentals necessary to install complete in place 6-Inch thru 12-Inch diameter Water Main, 6-Inch and 8- Inch diameter wastewater system, removal of and installation of various size Reinforced Concrete Pipe(RCP), Removal and reconstruction of storm water Inlets, Reinforced Concrete Sidewalks, 9-Inch Reinforced Concrete Paving, temporary ridding surfaces and traffic signal infrastructure at Rochelle Road (Traffic signal poles, lights and equipment will be provided and installed by the City of Irving), The city reserves the right to review all special permits and revise or revoke such permits at any time to ensure that public health, safety and welfare is given top priority. Question Cuttoff Date & Time 10/30/2023 03:30:00 PM (CT)

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.