Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

April 9, 2024

39000 Clock Tower Plaza Dr E

Renovation

No Information to Display

$139,369.00

Public - County

img_map_placeholder

39000 Clock Tower Plaza Dr E, Palmdale, CA

Subscribe to View Full Documents

The Antelope Valley Transit Authority, located in Lancaster, CA, is undertaking an improvement project to install two Level III chargers at the Palmdale Transportation Center. The project will be referred to as PTC Two Level III Charger Installation. Work includes but isn't limited to saw-cutting and patching back asphalt and concrete to install conduit for two new level three chargers. Install new concrete pads and bollards for new car chargers. Pick up two existing chargers from the AVTA main facility and install them at the designated location at PTC. All line items listed are approximate and should be verified by the contractor. The awarded firm will provide project management, supervision, scheduling, equipment, labor, materials, freight, taxes, and applicable permits for this project. The Contractor shall complete all work within 180 calendar days from Notice to Proceed. This construction project is federally funded and requires compliance with all applicable FTA rules and regulations along with the City of Lancaster, Los Angeles County, and State of California Departments, including but not limited to the Department of Industrial Relations labor codes, rules, and regulations. Conflict. In case of conflict between this web page / information and the Solicitation Documents and its Requirements and/or Specifications, Contract Terms and Conditions and Instructions for Proposers, the Solicitation Documents on file shall take precedence over and will be used in lieu of such conflicting portions of the web page/information regarding this procurement. Online Q&A Yes Q&A Deadline 09/25/2023 8:00 AM (PDT)

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.