Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 3, 2023

January 4, 2024

May 14, 2025

15013 Denver W Pkwy

Addition, Demolition, Renovation, Site Work

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

15013 Denver W Pkwy, Golden, CO

Subscribe to View Full Documents

Construction Services needed at the National Renewable Energy Laboratory (NREL). This project requires the successful awardee to completely renovate and expand approximately 3000 sq. ft of laboratory spaces and some associated support spaces in the FTLB. The scope includes demolition and space reconfiguration, coordinating with NREL for asbestos removal from existing chemical hoods, providing new casework and chemical hoods, new finishes, high purity piping, plumbing, HVAC equipment and electrical installations for lighting and equipment. The laboratory facilities support microbial bioenergetics research within the Biosciences Center that will strategically position Biochemical and Biophysical characterizations in adjacent areas to better coordinate generation of redox enzymes, strains development and the analytical capabilities in a safe manner. The work effort also requires removal of casework, chemical hoods (including coordinating removal of asbestos containing hoods) interior walls, HVAC equipment, plumbing, piping, electrical, fire, etc. and reconstructing the laboratory areas included in FTLB 173, 174, 175, 176, 178 and fan coil units in the neighboring office area, including all scope shown on the drawings and in the project specifications. Important Dates: 9/20/2023 - Intent to Propose Due 10/6/2023 - Technical Questions Due Please review attachments below for further details. Proposed subcontract award It is the intent of NREL to award 1 Firm Fixed Price Subcontract under this solicitation. 3. Proposed subcontract period of performance The anticipated basic period of performance is 6 months, beginning on the date of issuance of the Notice to Proceed

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.