Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

November 24, 2023

March 28, 2024

2441 S Hwy 27

Renovation

No Information to Display

$362,935.00

Public - State/Provincial

img_map_placeholder

2441 S Hwy 27, Somerset, KY

Subscribe to View Full Documents

Project shall include replacement of the indoor and outdoor units associated with the coolers and freezer. Outdoor units shall be located at grade. New wall, door and ceiling work shall be included. Service From: 10/30/2023 Service To: 03/28/2024 ALL TECHNICAL QUESTIONS SHALL BE EMAILED TO THE ARCHITECT/ENGINEER OF RECORD FOR THIS PROJECT. Furnish all labor, materials, equipment, tools, construction equipment and machinery, temporary facilities (i.e., storage trailers, etc.) and special utilities, and other services necessary for the construction, accomplishment, and complete installation, in a workmanlike manner, of the project, in accordance with the contract documents. This shall be deemed to include items and components hereinafter specified and/or shown on plans, completely assembled or erected in locations indicated, ready for final connections to service lines. Provision of fasteners, scribe, trim strips, closure panels, caulking/silicon, et. al., required to complete the installation (not final connection) shall be deemed included. It is the intent of the contract documents to provide each and every item and/or component to properly function and perform in a manner equal to the manufacturer's stipulations. It is the intention of these documents that work of the highest quality, greatest quantity, and greatest expense shown or specified be provided. Whether or not the word all is used in the specification, coverage is intended to be complete, except where partial coverage is specifically and expressly noted. In all cases where an item is referred to in the singular number, it is intended that reference shall apply to as many such items as are required to complete the work.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects