Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Multiple Locations, Marshall, MN

Subscribe to View Full Documents

2.1 The following is a general description of the work required for the building construction and site work for the project, hereinafter specified and shown on the drawings. Work includes removal and replacement of 20 patio doors located on the 2nd thru 6th floors with new sliding patio doors at Parkview apartments and related sidelights, transoms and related work. Work includes removal and replacement of 7 apartment unit entry doors at 2 story East Main Apartments and related work. 2.2 Unless otherwise specified, the contractor shall supply labor, transportation, materials, apparatus, fuel, energy, light, scaffolding, and tools necessary for the entire proper and final completion of their work; and shall install, maintain, and remove all equipment of the construction and other utensils or items, and be responsible for the safe, proper, and lawful construction, maintenance, and use of same; and shall construct in the best and most workmanlike manner, a complete project including everything properly incidental thereto as shown on the plans, stated in specifications or reasonably implied therefrom, all in accordance with the Contract Documents. 2.3 Work hours and access to the apartments shall be coordinated with the owner. The apartments are to remain occupied during construction, with as minimal disruption to the residents as possible. 2.4 Contractors will be required to park off-site. Construction deliveries to be coordinated with Facilities Director. Marshall Public Housing Commission - 2023 CFP, Parkview Apartments Patio Door Replacement & East Main Apartments Unit Door Replacement Site Directions: Parkview Apartments: 202 North First Street, Marshall MN 56258 East Main Apartments: 202 Main Street E, Marshall MN 56258 Work includes removal and replacement of 20 patio doors located on the 2nd thru 6th floors with new sliding patio doors at Parkview Apartments. Includes removal and replacement of 7 apartment unit entry doors at East Main Apartments and related work. Please contact Docunet at 763-475-9600 if you have any questions.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects