Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

November 17, 2023

August 18, 2024

To Be Determined

New Construction, Site Work

No Information to Display

$798,700.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Copperhill, TN

Subscribe to View Full Documents

**NOTICE: Documents Posted are for VIEWING PURPOSES Only ! - Bidding Documents needs to be Purchased thru the Civil Engineer, in order to Bid** - Copies of the Bidding Documents (PDF Format only)maybe obtained from the Issuing Office [NewsomeEngineering & Consulting, Inc. (770)-722-1089 or email newsomeengineers@bellsouth.net] by paying a deposit of$75.00per set The Project includes the following Work: The Section 2000 - Pump House #2 shall include, but not limited to; the complete construction of Pump House #2, including concrete slab and walk way. The work in this section shall include the site demolition requirements as shown on the construction plans, proper installation of all required above ground piping and yard piping, isolation valves, valve boxes, cut & plug existing watermains as required, connections to existing watermains, chemical feed equipment & accessories, radio telemetry system, wall mounted heater, building ventilation, building equipment, relocation and connection of Holding Tank #6, interconnection of both Holding Tanks#5 and #6, connection of Pump House #1 to Pump House #2, back-up generator, electrical, holding Tank overflow assembly, gravel for trench stabilization, repaving, 8 ft. chain link security fencing w/ lockable gate and Erosion & Sediment Control Complete. Bids are requested for the following Contract: SECTION 2000 - Pump House #2 (Project #: CHUD_WSI_2021_2000) All work on this project must be completed within 240 consecutive calendar days of the "Notice to Proceed" with Construction date. The selected Contractor must be able to start work within ten (10) days after the "Notice to Proceed" is issued.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.