Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 25, 2023

November 17, 2023

July 14, 2024

To Be Determined

Site Work

No Information to Display

$300,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Copperhill, TN

Subscribe to View Full Documents

*As of October 26, 2023, no bids were received on the bid date (10/25/2023) **NOTICE: Documents Posted are for VIEWING PURPOSES Only ! - Bidding Documents needs to be Purchased thru the Civil Engineer, in order to Bid** - Copies of the Bidding Documents (PDF Format only)maybe obtained from the Issuing Office [Newsome Engineering & Consulting, Inc. (770)-722-1089 or email newsomeengineers@bellsouth.net] by paying a deposit of$75.00per set The Project includes the following Work: The Section 1000 - 50,000 Gal. Steel Water Storage Standpipe shall include, but not limited to; the complete construction of the 50,000 Gal. Steel Water Storage Standpipe, including foundation design and construction, installation of all Standpipe accessories as shown on the plans and in these specifications. The work in this section shall include the site demolition requirements as shown on the construction plans, the installation of a 10 ft. x16 ft. insulated steel building(Exhaust Fans, Ventilation, Wall Mounted Heater),1,000 Gal. Vertical Hydropneumatic Tank, Duplex Water Booster Pump Station, Sodium Hypochlorite Analyzer/Booster Station in 5 ft. x ft. room including all appurtenances, proper installation of all required above ground piping and yard piping, isolation valves, check valves w/ concrete vaults, valve boxes, 6 inch Hot Taps, gravel for trench stabilization, 8 ft. chain link security fencing w/ lockable gate and Erosion & Sediment Control Complete Bids are requested for the following Contract: SECTION 1000 - 50,000 Gal. Steel Water Storage Standpipe (Project #: CHUD_WSI_2021_1000) All work on this project must be completed within 240 consecutive calendar days of the "Notice to Proceed" with Construction date. The selected Contractor must be able to start work within ten (10) days after the "Notice to Proceed" is issued. A Bid must be accompanied by Bid security made payable to Owner in an amount of Ten (10) percent of Bidders maximum Bid price All work on this project must be completed within 240 consecutive calendar day

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.