Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 11, 2025

October 20, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$42,050.00

Public - City

img_map_placeholder

Multiple Locations, Yucaipa, CA

Subscribe to View Full Documents

Saw Cutting, Asphalt Repair /Replacement, Slurry, and Paving The District reserves the right to accept or to reject any and all bids proposals, to waive any irregularities and to make an award that is determined by the District to be in the best interest of the Yucaipa Valley Water District. The Contractor shall provide Paving & Asphalt Maintenance services for the District on a contract basis. Additional notes may be added to line items within Attachment C. Paving & Asphalt Repair and Replacement Services: Comply with City of Calimesa and City of Yucaipa paving standards as provided in Attachment D. Removal of temporary asphalt and existing asphalt as maybe needed. Installation of hot patch (4 inches thick). Thicker installation of asphalt will be indicated on Attachment C. Asphalt base on patches over 6 inches thick will require a 3/4 inch base mix with a 1/2 inch mix cap. Saw cut and cleanup. Asphalt grinding 1/10 foot and overlay. Adjust existing manhole per District Standards. Subsidence subsurface repair per District standards. Contractor shall remove and legally dispose of all residues from maintenance service. Contractor shall begin repairs within one week of notification to proceed and four weeks to complete all repairs, or as approved in writing by the District Representative in advance of the contract expiration and any extension thereof.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.