Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

December 1, 2023

June 30, 2024

120 Sandalwood Pkwy W

Renovation

No Information to Display

$300,000.00

Public - City

img_map_placeholder

120 Sandalwood Pkwy W, Brampton, ON

Subscribe to View Full Documents

Contractor will design, build and install electric vehicle charging stations having 46 Level 2 and 4 level 3 charging connectors, associated infrastructure and warranty services at 120 Sandalwood Parkway west. Purpose of this project is to provide support infrastructure to charge future electric fleet vehicles and support the green fleet strategy. This project supports the term of Council priorities. Documents may be obtained at https://brampton.bidsandtenders.ca/ Question Deadline: Tue Oct 31, 2023 2:00:00 PM (EDT)

75 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects