Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

August 2, 2024

1 Drive 25A

Site Work

No Information to Display

$413,000.00

Public - State/Provincial

img_map_placeholder

1 Drive 25A, Johnson Lake, NE

Subscribe to View Full Documents

You can contact the Engineering Division at EMAIL ENGINEERING or by calling (402) 471-5548. Bid Location: Engineering Division Office Contact Name: Tiffani Gerber Contact Phone: 402-471-5571 Contact Email: tiffani.gerber@nebraska.gov In accordance with Neb. Rev. Stat. 72-803 (4), bidder's proposal shall be submitted on a form supplied with the Bidding Documents and must be accompanied by a certified check, cashier's check, or Bid Bond in the amount of 5% of the total Bid, made payable to the Nebraska Game and Parks Commission as Bid security. Bid security shall be considered as liquidated damages and forfeited to the Nebraska Game and Parks Commission if the Bidder's proposal is accepted and the Bidder fails to execute the contract and provide the required bond(s) and insurance specified. No Bid Bond will be required if the total project cost is less than $50,000.00. Refer to the Drawings for the location of the Project at Johnson Lake SRA near Elwood, Nebraska. B. The Independent Contractor shall limit his construction activities to the immediate construction area and to approved storage areas on the Site. C. Access to the remainder of the Site for State employees or their designated representative shall be maintained during construction. D. The Independent Contractor shall provide barricades, safety or warning devices, signs and warning lights required for the protection of employees, the public and property. E. The area drives and parking lots may be used for material and equipment deliveries and access, if and only if, the Independent Contractor suitably protects the areas from damage, does not interfere with use of SRA outside the construction area, and maintains the access routes reasonably clean as determined by the Owner.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.