Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 27, 2023

April 1, 2024

Multiple Locations

Site Work

No Information to Display

$225,715.00

Public - City

img_map_placeholder

Multiple Locations, Colleyville, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

perform all construction, modifications, and supply all materials and equipment for the rehabilitation of sanitary sewer manholes within the City of Colleyville, Texas, 76034. The locations of manholes varies throughout the city and repairs are based on rehabilitation priority. Bidders should submit all inquiries and/or questions concerning this project to the person identified below by Friday, September 29, 2023 at 5:00 P.M. Questions that result in changes to the specifications will be answered in writing and copies distributed to bidders of record in the form of an addendum. Elijah Dorminy 100 Main Street Colleyville, TX 76034 817.503.1104 edorminy@colleyville.com Rehabilitation Method 1041- Installation of Protective Epoxy Coatings for Manholes This section covers the coating and rehabilitation of structures within wastewater collection system and stormwater conveyances with the use of a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other structures. This specification covers work, materials, equipment and tools including specially developed application equipment as required for installation of a field applied unique monolithic interior surfacing system. The use of specialized equipment combined with rigorous surface preparation requirements shall be used to apply the products without the use of solvents. The equipment adds high heat and pressure to the monolithic surfacing system resulting in a high build and quick set of the completed system. Product application requirements and procedures described herein include surface preparation, mixing application, material handling and storage, qualification of the applicator and application quality control. b. The minimum coating thickness shall be as described in the following: i. Manholes (concrete) minimum coating of 250 mils ii. Manholes (brick) minimum coating of 300 mils

74 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects