Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 6, 2023

May 22, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$2,356,324.00

Public - City

img_map_placeholder

Multiple Locations, Burrillville, RI

Subscribe to View Full Documents

The Town of Burrillville is requesting sealed bids for construction of the Proposed Water Loop and Sewer Extension Improvements in Burrillville, RI. The project includes removal of existing pavement and berm, installation of new water main and services, installation of new sanitary sewer gravity and force main piping, structures, new pavement installation and all appurtenant work. The Town of Burrillville reserves the right to reject any and all bids, to waive any informality in the bids received, to award a bid in part or in whole, and to accept the bid that is considered to be in the best interest of the Town of Burrillville. Location Route 102 and Lapham Farm Road Burrillville, Rhode Island Substantial completion of the water loop and sewer extension improvement work consisting of, but not limited to, the installation of approximately 3,955 linear feet of 12-inch diameter ductile iron water pipe, approximately 55 linear feet of 6-inch diameter ductile iron water pipe, and approximately 73 linear feet of 4-inch diameter ductile iron water pipe including removal of unsuitable material, plugging and capping new pipes, coordination and scheduling of inspections with the Harrisville Fire District, submitting and obtaining approval of as-built record drawings from the Harrisville Fire District, gate valves, gate boxes and covers, bends, tees, fittings, thrust blocks, joints and appurtenances, installation of new fire hydrants, including lateral piping, valves, valve boxes, fittings, joints and appurtenances, installation of new copper water services including corporation cock, curb stop, gate box and cover, pipe insulation (where required), installation of approximately 314 linear feet of 8- inch diameter PVC sanitary sewer pipe, installation of approximately 15 linear feet of 6-inch diameter PVC sanitaiy sewer pipe, installation of approximately 886 linear feet of 4-inch diameter PVC sanitaiy sewer force main pipe, installation of approximately 872 linear feet of 2-inch diameter PVC sanitaiy sewer force main pipe, installation of sanitaiy sewer manholes, installation of frame and covers, installation of sanitaiy force main flushing connections, installation of ductile iron pipe for sleeves, coordination and scheduling of inspections with the Burrillville SewerDepartment, submitting and obtaining approval of as-built record drawings from the Burrillville Sewer Department, sawcutting bituminous pavement, removal and disposal of bituminous pavement, installation of gravel borrow, installation of controlled low strength material (flowable fill) Type I, installation and removal of temporary bituminous pavement, installation of permanent bituminous pavement, earthwork, including excavation, placement of fill and grading, dewatering, trench excavation, excavation oftest pits to verify location and depth of existing utilities and potential ledge, installation of erosion controls, including cleaning and removal at end of project, removal and disposal of bituminous berm and paved waterways, removal of bituminous pavement by micro milling, installation of new bituminous berm and paved waterways, removal and resetting of signs, rock excavation, installation of common borrow, trimming and fine grading, testing and sterilization of new water pipe, connection to existing water system, installation of pavement markings, installation of loam and seed, cleaning catch basins, cleaning and flushing of pipe, utility supports, traffic control and all materials, equipment, services and construction required to complete the work in a manner acceptable to the Owner, shall be completed by:

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.