Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

December 11, 2023

May 8, 2026

1333 Mayflower Ave

Paving, Site Work

No Information to Display

$69,806,992.00

Public - County

img_map_placeholder

1333 Mayflower Ave, Monrovia, CA

Subscribe to View Full Documents

Q&A Deadline 09/28/2023 5:00 PM (PDT). The San Gabriel Council of Governments (SGVCOG) is accepting bids for a proposed grade separation located on Turnbull Canyon Road in the City of Industry and Unincorporated Los Angeles County within the Union Pacific Railroad (UPRR) Los Angeles Subdivision at milepost 17.18. The grade separation is between Mal brook Drive to the South and Don Julian Road to the North. Turnbull Canyon Road will be elevated above the UPRR Railroad and San Jose Creek. The project work includes the construction of typical street features such as curb, gutter, sidewalk, roadway structural sections, landscape and irrigation, and site and private property improvements; bridge construction including demolition of the bridge over San Jose Creek, construction of CIDH piles, abutments, abutment caps, columns, column bent, pedestrian steel bridge, and earth retaining structures; construction of storm drain improvements, modifications, and relocations; grading and preparing the site within the City and County right-of-way, drainage facilities, sewer and water relocations, relocation of utilities; installation of street, bridge, and parking lot lighting, signing and striping, water main, and protection, modification, and/or relocation of existing dry and wet utilities. Temporary work consists of shoring, excavation support systems, temporary utilities, and traffic control. Bid Valid 180 days Start/Delivery Date Early 2024 Bid Bond 100.00% Payment Bond 100.00% Performance Bond 100.00%

65 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.