Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2023

November 10, 2023

December 14, 2024

6000 Jupiter Rd

Renovation

No Information to Display

$93,792.00

Public - City

img_map_placeholder

6000 Jupiter Rd, Plano, TX

Subscribe to View Full Documents

This project will be in two (2) separate phases (Front Vestibule to Desk and Front Desk to Cardio Area) 1. Remove and/or protect all light fixtures,sprinkler & speaker covers. 2. Protect all walls and floor. 3. Remove all existing texture down to gypsum wall board substrate. 4. Patch, tape and bed any areas damaged by texture removal. 5. Apply Acrylic Polymer primer on entire ceiling. 6. Apply a new 3/8" coat of White SonaSpray Insulation over existing material to restore its original appearance. 7. Re-install & adjust light fixtures, sprinkler trim rings, and speaker covers (Flush with new SonaSpray) 8. Include in your proposal, all scissor lifts and/or scaffolding. 9. Include Supervision, General conditions, and Debrisremoval & disposal. 10. Bid based on normal working hours, Lobby shut down to public in phases as directed by the City of Plano. Include: Permit fees and sprinkler head adjustments if necessary. Oak Point Recreation Center Resurface Main Lobby Ceiling Project No. FAC-F-7636 The City of Plano is soliciting low bids to refresh the ceiling in the lobby area by removing the existing spray texture and replacing with new. This project will be completed in two (2) phases. The contractor shall include all equipment, labor cost, and materials into bid per specifications. Questions deadline: 9/27/23 at 11:00 AM

39 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.