Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2023

January 16, 2024

May 15, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Boulder, CO

Subscribe to View Full Documents

Reference Number 0000329813 Question Acceptance Deadline 10/04/2023 at 4:00 PM MT Overview - be sure to review project requirements for both project sites (1 - Eagle and Sage Trails; and 2 - Kelso Road) in the contract documents. a) Eagle and Sage Trails: i) Description: Gravel-surfaced roads. ii) Primary purposes: (1) Recreational trail use by hikers, runners, bicyclists, and equestrians (horseback riders). (2) Road/vehicle access for agricultural operations, OSMP administrative operations, and emergency access. Public motorized vehicle use is prohibited - a gate blocks the road entrance. b) Kelso Road: i) Description: Simple two-track unimproved road. ii) Primary purpose: OSMP administrative vehicle access route. It is occasionally used recreationally by walkers, but this is not an official designated use of the road. Public motorized vehicle use is prohibited - a gate blocks the road entrance. 2) Description of Work: a) Eagle and Sage Trails: Implement repairs of the roads to improve conditions according to the provided Plans and Specifications. The goals are to: i) Repair erosion and mud issues. ii) Improve drainage to prevent future deterioration of the road. iii) Improve recreational experiences for trail users. b) Kelso Road: Repair the sinkhole that has formed on an embankment - review the enclosed "Kelso Road Sinkhole Repair" documents for details. There are not engineered plans for this work - OSMP looks to the Contractor to recommend best practices and options for repairing this site. 3) Timeline: a) Construction work may be started afterall of the following: i) Tuesday, January 16, 2024 ii) Issuance of the Contract Notice to Proceed to the Contractor iii) Contractor notification to OSMP a minimum of 2 weeks prior to construction to ensure that OSMP has adequate to implement trail/trailhead closures and provide public notification. b) March 15, 2024: i) Substantial Completion of Eagle and Sage Trails Phase 1 construction. c) May 6, 2024: i) Substantial Completion of Eagle and Sage Trails Phase 2 construction. ii) Substantial Completion of Kelso Road sinkhole repair. d) May 15, 2024: i) Final Completion. The City of Boulder is requesting bids from qualified contractors to repair two project sites: Eagle and Sage Trails (which serve as recreational trails and administrative and agricultural access roads) and Kelso Road (a simple two-track access road). The work shall be implemented according to the project plans and contract documents. The proposal guaranty shall be a certified check, cashier's check, or bid bond in the amount of 5 percent of the Contractors total bid. The City of Boulder reserves the right to make the award on the basis of the bid deemed most favorable to the City, to waive any informalities or to reject any or all bids. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required

54 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.