Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

March 4, 2024

August 31, 2026

811 E Brigham Rd

New Construction, Site Work

No Information to Display

$66,400,000.00

Public - County

img_map_placeholder

811 E Brigham Rd, St George, UT

Subscribe to View Full Documents

Reference Number 0000329743 The purpose of this RFP is to solicit competitive proposals from qualified firms for a Construction Manager (at risk)/General Contractor (CM/GC). Firms must be licensed and certified as applicable in the State of Utah, to construct a new Snow Canyon Middle School per design from NWLA Architects. The CM/GC will work closely with the Washington County School District Facilities Director and NWLA Architects, through the design phase, providing cost estimates, schedules and feedback of design details, phasing, and availability of materials selected. CM/GC will also monitor the bid climate and recommend the optimal bidding schedule to the design team. The Washington County School District intends to construct a new replacement school at Snow Canyon Middle School. The anticipated square footage will be approximately 166,ooo sf. It is anticipated that the project will begin construction approximately March of 2024 with anticipated occupancy in August 2026. Site plans, floor plans and exterior elevations will be available at the mandatory pre-bid conference. See Item J above. Question Acceptance Deadline 09/28/2023 2:00 PM MDT Questions are submitted online Yes All inquiries and questions related to this Request for Proposal must be submitted on the original posting on the Bidnet website. Phone calls and emails will be referred to the original posting. Fixed Limit of Construction Costs The Fixed Limit of Construction Costs (FLCC) for this project is currently $66,400,000. ($400 psf) Offering Contractors will be required to provide evidence of 100% payment and performance bonds for the Fixed Limit of Construction Cost (FLCC) with their proposal. *Washington County School District reserves the right to accept or reject any or all proposals and to waive any formality, informality, irregularity, or technicality in any proposal. The District also reserves the right to call for new bids if their interests or convenience is better served by such course. The Washington County School District intends to construct a new replacement school at Snow Canyon Middle School. The anticipated square footage will be approximately 166,ooo sf. It is anticipated that the project will begin construction approximately March of 2024 with anticipated occupancy in August 2026. Site plans, floor plans and exterior elevations will be available at the mandatory pre-bid conference. See Item J above.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects