Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 3, 2023
March 4, 2024
August 31, 2026
811 E Brigham Rd
New Construction, Site Work
No Information to Display
$66,400,000.00
Public - County
811 E Brigham Rd, St George, UT
Reference Number 0000329743 The purpose of this RFP is to solicit competitive proposals from qualified firms for a Construction Manager (at risk)/General Contractor (CM/GC). Firms must be licensed and certified as applicable in the State of Utah, to construct a new Snow Canyon Middle School per design from NWLA Architects. The CM/GC will work closely with the Washington County School District Facilities Director and NWLA Architects, through the design phase, providing cost estimates, schedules and feedback of design details, phasing, and availability of materials selected. CM/GC will also monitor the bid climate and recommend the optimal bidding schedule to the design team. The Washington County School District intends to construct a new replacement school at Snow Canyon Middle School. The anticipated square footage will be approximately 166,ooo sf. It is anticipated that the project will begin construction approximately March of 2024 with anticipated occupancy in August 2026. Site plans, floor plans and exterior elevations will be available at the mandatory pre-bid conference. See Item J above. Question Acceptance Deadline 09/28/2023 2:00 PM MDT Questions are submitted online Yes All inquiries and questions related to this Request for Proposal must be submitted on the original posting on the Bidnet website. Phone calls and emails will be referred to the original posting. Fixed Limit of Construction Costs The Fixed Limit of Construction Costs (FLCC) for this project is currently $66,400,000. ($400 psf) Offering Contractors will be required to provide evidence of 100% payment and performance bonds for the Fixed Limit of Construction Cost (FLCC) with their proposal. *Washington County School District reserves the right to accept or reject any or all proposals and to waive any formality, informality, irregularity, or technicality in any proposal. The District also reserves the right to call for new bids if their interests or convenience is better served by such course. The Washington County School District intends to construct a new replacement school at Snow Canyon Middle School. The anticipated square footage will be approximately 166,ooo sf. It is anticipated that the project will begin construction approximately March of 2024 with anticipated occupancy in August 2026. Site plans, floor plans and exterior elevations will be available at the mandatory pre-bid conference. See Item J above.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
St George, UT
Bid Date: Oct 24 2023
St George, UT
Bid Date: Nov 13 2023
St George, UT
Bid Date: Nov 13 2023
St George, UT
Bid Date: Nov 15 2023
DFCM Construction Pre-Qualified Roofing - Utah Tech University Heat Plant Roof Replacement - 5217556
St George, UT
Bid Date: Nov 14 2023
St George, UT
Bid Date: Sep 19 2023
St George, UT
Bid Date: Oct 09 2023
St George, UT
Bid Date: Oct 23 2023
St George, UT
Bid Date: Oct 03 2023
St George, UT
Bid Date: Oct 03 2023
St George, UT
Bid Date: Oct 17 2023
St George, UT
Bid Date: Nov 15 2023
St George, UT
Bid Date: Oct 05 2023
St George, UT
Bid Date: Aug 10 2023
St George, UT
Bid Date: Aug 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
