Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 6, 2023

June 3, 2024

44961 Loudoun Water Way

Renovation

No Information to Display

$199,000.00

Public - County

img_map_placeholder

44961 Loudoun Water Way, Ashburn, VA

Subscribe to View Full Documents

Questions Deadline: 9/28/2023 05:00 PM (ET) Questions about the Project shall be submitted electronically through the IONWAVE solicitation Questions section. A. The Work includes, but is not limited to, the following 1. Project provides the replacement of the existing Uninterruptible Power Supply (UPS), replacement of existing transformer, and all appurtenances, in the operations building (Building O) at the Broad Run Water Reclamation Facility (BRWRF). B. Work included: Contractor shall furnish labor, superintendence, materials, power, light, heat, fuel, water, tools, appliances, equipment, supplies, and other means of construction necessary or proper for performing and completing the Work. The Contractor shall obtain and pay for all required permits, not obtained by Loudoun Water. Reference the Supplementary Conditions for permits obtained by Loudoun Water. The Contractor shall protect the Work during construction. The Contractor shall perform and complete the Work consistent with safety of life and property and in strict accordance with the Contract Documents. The Contractor shall clean up the Site and shall maintain it during and after construction and shall do all Work and pay all incidental costs during and after construction. The Contractor shall repair, restore and clean structures and property that may be damaged or disturbed during the performance of the Work. C. Contractors materials and Equipment: The Contractor shall be solely responsible for the adequacy of his materials and equipment. Broad Run Water Reclamation Facility Building O UPS Replacement. Required Bid security in the form of a Bid Bond or certified check in the amount of 5% of the Bid Price.

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.