Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 19, 2024

March 19, 2024

October 24, 2025

US-180

Outdoor Lighting, Paving, Site Work

No Information to Display

$34,830,374.00

Public - State/Provincial

img_map_placeholder

US-180, Silver City, NM

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Termini: Us 180, Mp 123.136 to Mp 128.261 for 5.126 Miles County: Grant (District 1) Type of Work: Roadway Reconstruction and Rehabilitation, Signalization, Lighting, Its Contract Time: 400 Working Days DBE Goal: at This Time Nmdot Will Meet the State Dbe on Federally Assisted Projects Through a Combination of Raceneutral and Race-conscious Measures. This Project is Subject to Race-conscious Measures. The Established Dbe Goal for This Project is 0.00%. Licenses: (Ga-1 or Ga-98) and (Gf-2 or Gf-98) and (Ee-98) Funding Type: Federal-aid Listing Threshold: $8,000 (Subcontractors Fair Practices Act Compliance) Wage Rate (Federal): Nm20240036 Wage Rate (State): Type "a" (2024) As a condition to submitting a Bid all Bidders bidding as Contractors are required to be prequalified with the NMDOT's Office of Inspector General seven (7) Days before Bid Opening per 18.27.5 NMAC. All Subcontractors are required to be prequalified before performing any Work and prior to supplying goods or services to the Project. The Bidders prequalification factor rolling average will be applied to any Project with an engineers estimate greater than $5 million. The Bidders Bid Guaranty shall be five percent (5%) of the Bidders Total Bid Amount and shall be submitted before Bid Opening through either Surety 2000 or Tinubu Surety. Failure of the Bidder to comply with this Advertisement shall render the Bid non-responsive and the Bid shall be rejected. NMDOT - 001 - Roadway Reconstruction and Rehabilitation, Signalization, Lighting, ITS - US 180

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.