Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 28, 2023

January 29, 2024

October 22, 2025

10844 Ellis Ave

Site Work

No Information to Display

$3,330,000.00

Public - County

img_map_placeholder

10844 Ellis Ave, Fountain Valley, CA

Subscribe to View Full Documents

C-NIB-073123 License Requirements "A" The Project is located at Plant No. 1 at 10844 Ellis Avenue, Fountain Valley, CA 92708. This project will replace approximately 600 feet of ductile iron piping used in colling water service at the Plant No. 1 CenGen facility. Associated appurtenances including fittings valves, and wired and unwired instruments as well as associated wiring will also be replaced. The Orange County Sanitation District reserves the right to reject any or all Bids and to waive or not to waive any or all irregularities. Deadline October 23, 2023, at 5:00 PM PT Written questions must be sent by email at construction@ocsan.gov to the attention of Jay Kaura, Contracts Administrator A Bid Security of not less than ten percent (10%) of the Total Amount of Bid will be required with each Bid and no Bid will be considered without it. The Bid Security may be in the form of cash, a cashier's or certified check payable to OC SAN, or a Surety issued by a qualified corporate Surety licensed to do business in California and must be submitted using the form included in the Bid Submittal Forms. A and a each in the amount of 100% of the Contract value are required concurrently with the execution of the Contract and shall remain in effect through the warranty period. The and the are to be executed in the name of the Surety insurer under penalty of perjury duly acknowledged before an officer authorized to take and certify acknowledgements and either one of the conditions listed in the Instructions to Bidders must be satisfied.

71 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects