Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 19, 2023

February 19, 2024

May 31, 2025

Multiple Locations

Site Work

No Information to Display

$1,663,600.00

Public - City

img_map_placeholder

Multiple Locations, Waukee, IA

Subscribe to View Full Documents

Construct Bluestem Trunk Sewer- Phase 2 including all labor, materials and equipment necessary for approximately 3,500 linear feet of 8-inch through 12-inch diameter sanitary sewer by trenchless and open cut, manholes, excavation and backfill, lift station demolition, surface restoration and miscellaneous associated work, including cleanup. The Bluestem Trunk Sewer - Phase 2 project is located north of SE Ashworth Road between Timber Creek Lane and SE Parkview Crossing Drive. The duration of the work is critical to the project so as to minimize the disruption associated with the project to the public. Damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each day that the sanitary sewer is not tested, televised and operational after November 30, 2024 at the sole discretion of the City with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. The work will commence within ten (10) calendar days after the date set forth in written Notice to Proceed. The interim completion date with the sanitary sewer fully installed, tested and operational is November 30, 2024 subject to any extensions of time which may be granted by the City. All work on the project shall be completed by May 31, 2025. Damages in the amount of Five Hundred Dollars ($500.00) per calendar day will be assessed for each day that the project is not completed after May 31, 2025 at the sole discretion of the City with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Separate damage assessments may be made for each of the two completion dates. At the option of the City, damages may be deducted from any retainage prior to release, the final payment to contractor, or through the commencement of a cause of action by the City, in the City's sole discretion. The selection by the City of any particular course of action hereunder is not exclusive and shall not preclude the pursuit of additional remedies by the City. Please contact the City Clerk's office at 978-7904 or bschuett@waukee.org if you have questions or electronic accessibility issues.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.