Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2023

November 3, 2023

No Information to Display

Center Star Cut Off Rd

Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Center Star Cut Off Rd, Pell City, AL

Subscribe to View Full Documents

Construction of Installation of Approximately 2,700 Lf of 6 Pvc Water Line, 370 Lf 8 Hdpe Directional Bore, 70 Lf 10 Steel Casing (Open Cut), Master Meter Vault and Related Items. All Bidders must be properly licensed in accordance with the requirements of the State Licensing Board for General Contractors (Chapter 8, Title 34, Code of Alabama, 1975 or latest). Project Estimate: $250,000.00 - $300,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.