Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

November 16, 2023

March 31, 2024

Farr Ave

Paving, Site Work

No Information to Display

$913,295.00

Public - City

img_map_placeholder

Farr Ave, Fairfax, VA

Subscribe to View Full Documents

Construction of an extension of Farr Avenue, creating a new north-south roadway between Fairfax Boulevard and Orchard Street. Questions Deadline September 26, 2023 A fully completed and properly executed original Bid Bond, cashier's check, certified check, money order, or cash escrow in the amount of five percent (5%) of the amount of the bid made payable to the Treasurer of the City shall accompany each bid. The project scope includes, but is not limited to the following Work as specified in the City of Fairfax Public Facilities Manual and/or VDOT Standards/Specifications as applicable: o Earthwork and grading o Road construction, including associated curb & gutter and parking bump-outs o Pedestrian accommodations including sidewalk and curb ramps o Storm drainage and stormwater management improvements o Streetlights (acorn style), including associated conduit & electrical work o Permanent pavement markings & signing o Landscaping and beautification o All measures required for erosion & sediment control and maintenance of traffic o Materials testing in accordance with the current VDOT Inspection Manual o Other items necessary for completion of the work per contract documents The construction plans for this project depict work performed between Fairfax Boulevard and the realigned leg of Orchard Street. However, only a portion of this work is included within the scope of thisIFB. Farr Avenue Extension work shall only be performed on Parcel 003 (C/L Sta. 15+04.17 to C/L Sta. 18+68.36. Work depicted south of this property boundary (including Parcel 001 and work within Fairfax Boulevard ROW) is to be performed by others and is explicitly excluded from this IFB. Work described within this IFB is also inclusive of road work to construct the intersection with Farr Avenue Extension and Northfax Street, formerly and referred to in the plans as Orchard Street. Work on Northfax Street shall be performed between C/L Sta. 600+00.00 and C/L Sta. 600+38.02.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.