Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2023

June 17, 2024

March 31, 2026

Multiple Locations

Site Work

No Information to Display

$45,000,000.00

Public - City

img_map_placeholder

Multiple Locations, Denison, TX

Subscribe to View Full Documents

The City anticipates the scope of work will consist of, but not limited tom the following major elements: 24-Inch Diameter Waterline - Phase II and Phase III of the Northwest Waterline: Final design support, administration, and construction of up to 20,000 (phase II and III from City property all the way up FM 84) linear feet of 24-inch diameter and 5,500 linear feet of 18-inch PVC waterline. 36-Inch Diameter Interceptor - Phase IV and Phase V of the Northwest Interceptor: Final design support, administration, and construction of an expansion up to 28,500 linear feet (full length) of 36-inch diameter FRP or PVC interceptor. Refer to the Description of Work for additional information. Sanitary Sewer Truck Receiving Station: Final design support, administration, and construction of a sanitary sewer truck receiving station that will be located on City property along the Phase IV section of the 36-inch diameter interceptor. The purpose of the station is to receive sanitary sewer waste from trucks carrying up to 5,000 gallons of liquid waste. Lift Station: Final design support, administration, and construction of a lift station to be phased for buildout capacity of 10 MGD. Dual Force Mains: Final design support, administration, and construction of dual force mains (8-inch and 24-inch) to connect the lift station to Phase V wastewater interceptor. The distance between the lift station and the phase V interceptor is approximately 10,000 feet. The Citys preliminary budgetary estimate range for construction of this Project is approximately $40 million to $45 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

62 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects