Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 6, 2023

No Information to Display

Multiple Locations

New Construction, Renovation

No Information to Display

$2,000,000.00

Public - County

img_map_placeholder

Multiple Locations, Phenix City, AL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of October 26,2023, bids were rejected. No definite date for the rebid.** Construction of two turnkey Community Restrooms at the following locations 9 Woodland Drive at the Ladonia Pavilion/Walking Trial 868 Highway 165 at the Ft. Michell Park Scope of work: Build a men's and women ADA handicap accessible bathroom per plans. Here are our lists of specifications HVAC Electrical service o 2ton mini split heat pump with three indoor heads. o One wall mounted air handler in men's room, o One wall mounted air handler in women's o One wall mounted air handler in plumbing closet. o Condenser to be mounted on rear wall of building at 42" off grade. o All condensate drain lines to terminate into one exterior termination. o Site prep. o Form, plumb and finish monolithic slab 4inch above grade, total square footage 217. o Exterior/ interior Walls to be split face painted 8" block for AO" high and above 8" stucco block o Exterior/Interior colors to be picked at build and indoor must be the washable style. o Ceiling height 9' ceiling to be 2/2 acoustical vinyl coated sheet rock tile. o Roof framework to be 2/6 rafters on 16" center roof pitch 12/12 with 6/12 pitch 6' front porch o Gables to be pre-primed concrete lap siding. o Soffit to be 3/16 concrete board and facial vinyl coated trim. o Roofing to be architect singles (color picked at build) with vent ridge and drip edge. o 3- Doors 3' exterior steel with steel jams and stainless ADA hardware on Men's and women's door plumbing closet must also have a dead bolt lock included keyed differently. o 24'by 8, handicap approved concrete sweeping entrance way. cal service o 2ton mini split heat pump with three indoor heads. o One wall mounted air handler in men's room, o One wall mounted air handler in women's o One wall mounted air handler in plumbing closet. o Condenser to be mounted on rear wall of building at 42" off grade. o All condensate drain lines to terminate into one exterior termination. o Site prep. o Form, plumb and finish monolithic slab 4inch above grade, total square footage 217. o Exterior/ interior Walls to be split face painted 8" block for AO" high and above 8" stucco block o Exterior/Interior colors to be picked at build and indoor must be the washable style. o Ceiling height 9' ceiling to be 2/2 acoustical vinyl coated sheet rock tile. o Roof framework to be 2/6 rafters on 16" center roof pitch 12/12 with 6/12 pitch 6' front porch o Gables to be pre-primed concrete lap siding. o Soffit to be 3/16 concrete board and facial vinyl coated trim. o Roofing to be architect singles (color picked at build) with vent ridge and drip edge. o 3- Doors 3' exterior steel with steel jams and stainless ADA hardware on Men's and women's door plumbing closet must also have a dead bolt lock included keyed differently. o 24'by 8, handicap approved concrete sweeping entrance way. o 200-amp single phase 30 circuit main lug only indoor panel with 200-amp exterior disconnect. o 6 - 120volt 20-amp single pole circuits, 2- 230-volt 30amp double pole circuits. o 2 hand dyers 120-volt dedicated circuits men's and women's o 2- 120volt 20amp Womens / men's lights dedicated circuits o 1 - 120volt 20-amp chill water bottle filler o 1 -120 volt 20-amp circuit for plumbing closet o 1 plumbing and mechanical closet o l-30amp 230volt circuit to 20-gallon water heater o l-30amp 230volt circuit to HVAC o Led lights in both bathrooms and plumbing closet with emergency back-up battery's Plumbing landscaping o Done by others o Indoor Lights and bathroom Vent fans (100 CFM) style to be controlled with occupancy sensors, o Bathroom vents must be vented outdoors. o Three exterior wall lights controlled from indoor time clock o Men's and women's restrooms to have one Commencai toilet with automatic valves. o Wall mounted sinks with all touchless faucets with ADA plumbing covers. o Men's room to have one urinal with touchless faucets. o 20-gallon electric water heater with expansion tank and safety pan. o Mop sink in plumbing closet with Commencai faucets. o Men's and women's restrooms have 4floor drains with trap primers run from sink drains. o Water supply /Sewer Sewage disposal handle by the County If you have any questions concerning terms or conditions, specifications, or any other aspects of the Request for Bid, please contact the following: Shawn Blakeney, County Engineer 97 Poorhouse Road Seale, Alabama 36875 Ph: (334) 855-0209 Fax (334) 855-1232 E-mail: sblakeney@rchd.us

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects