Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 10, 2023

June 12, 2024

Av. Hillside

Renovation

No Information to Display

$711,171.00

Public - City

img_map_placeholder

Av. Hillside, Westmount, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1759894 Deadline for receiving complaints: 2023-10-04 The OMHM is conducting a public call for tenders for renovation work on the common areas and lobbies of the 7 buildings, at Habitations Place Hillside, located at the following addresses: 90, 100, 110, 120, 130, 140, 150 Hillside Avenue in the City of Westmount. The project consists of carrying out all the work in accordance with the contractual documents. Without limitation, the scope of work includes: Repair the concrete slab and replace the flooring in the common areas of the ground floor. General rehabilitation of the common areas on the ground floor. Replace the main entrance doors of buildings. Recondition the front stairwells of some buildings. Replace certain electrical components (luminaires, baseboards, unit heater). The work will be carried out in seven buildings, which were built in 1974 and total 64 dwellings for families and individuals. Three buildings consist of three floors and four two-storey buildings. The frame of the buildings is composed of concrete blocks. During the work, the units will be occupied. According to the current plan, it is expected that work will begin as soon as the commitment letter is signed, but this date may be modified by the OMHM. In such a case, the amendment cannot be used to justify a request for an extra on the part of the successful tenderer. The work must be carried out within a maximum of 140 working days from the date of commencement of the work in the letter of commitment

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects