Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2023

November 14, 2023

No Information to Display

228 12 Ave SE

Renovation

No Information to Display

$100,000.00

Public - City

img_map_placeholder

228 12 Ave SE, High River, AB

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The successful proponent will have total control over the Design Services and Construction of the Work for the Bob Snodgrass Recreation Complex Large Arena Slab Replacement Project. At a minimum, the scope of work for the "Large Arena Slab Replacement" project includes: Design, supply and installation of functional: Existing header and header trench demolition Existing slab and cooling line demolition. Equipment and components required to install the large arena slab New refrigeration header with capability to independently operate arena sheet New below slab heating system Barrier-free accessibility to ice surfaces Ice sheets Replace existing snow melt pit grating with new grating c/w pneumatic open/close operation. Controls for pneumatic operation to be accessible while seated in ice re-surfacer. Pedestrian and worker warning system to be developed and installed for instances while the ice pit is in "open" position. Retain the services of a qualified geotechnical firm to conduct a geotechnical study to determine the soil and groundwater conditions under the large arena slab and confirm the extent of remediation required for support of the new slab. Previous geotechnical investigation reports conducted at the facility are included Appendix F Reinstallation/modification of plexiglass and arena dasher boards to accommodate new design. Reinstallation of netting. All site work must be completed during off season between the 2023/2024 and 2024/2025 hockey seasons.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.