Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 6, 2023

September 27, 2024

July 31, 2025

2326 Venetian Dr SW

Renovation

No Information to Display

$300,000.00

Public - City

img_map_placeholder

2326 Venetian Dr SW, Atlanta, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe to View Full Documents

The owner has selected a Construction Manager. The Atlanta Public Schools seeks a Construction Manager to complete the HVAC System replacement and or modifications. The successful Construction Manager will be expected to provide all the services included in the standard APS Construction Management Agreement (the Contract ) for building improvements at the following location: Cascade Elementary School 2326 Venetian Drive, S.W Atlanta, GA 30311 If you are unable to download these documents, you may contact the contract services administrator: Alicia White at Alicia.White@atlanta.k12.ga.us. Question Deadline 09/20/2023 at 2:00 PM ET 09/20/2023 Deadline for written questions, 2 p.m., ET All questions or requests for clarification must be sent via Bonfire under Message - Opportunity 3.5.1. Provide construction services for a new building-wide HVAC system. The desired system shall be a three-pipe, variable refrigerant flow (VRF)system making use of cassettes, fan coil units, DXfv split air handlers. 3.5.2 Condensers dedicated to the outdoor air units, rooftop, and package units. 3.5.3 Install new electrical for the new Generator installation. 3.5.4 Installation of a building generator. 3.5.5 Structural modifications in support of the new HVAC system. 3.5.6 Electrical modifications in support of the new HVAC system. 3.5.7 Plumbing modifications in support of the new HVAC system. 3.5.8 Architectural modifications in support of the new HVAC system. 3.5.9 Modifications to the fire alarm and life safety systems. 3.5.10 Modifications to the clock bell intercom system in support of the HVAC system. 3.5.11 Modifications to the new building automation system (BAS) in support of the HVAC system. New Controls shall be ALC. 3.5.12 City of Atlanta permitting. 3.5.13 The CM shall be required to coordinate with the Atlanta Public Schools Commissioning Agent on all phases of the project from pre-planning to conclusion. This will include but may not be limited to plan review, submittal review, project inspections, documentation, response to commissioning agent comments, and resolutions. Final sign-off on the reports. 3.5.14 The CM shall be required to coordinate with the Atlanta Public Schools Test & Balance vendor on all phases of the project from pre-planning to conclusion. 3.5.15 All work is to be substantially completed no later than June 30, 2025. 3.5.16 The Stated Cost Limitation (SCL) is $4,546,000.

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.