Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2023

April 30, 2024

No Information to Display

To Be Determined

Renovation

No Information to Display

$292,885.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Reno, NV

Subscribe to View Full Documents

As of October 13, 2023, project is on hold. No definite date for the rebid. Mason Valley Fish Hatchery Cooling Tower Rehab Project In accordance with the Contract Plans and Specifications, the Project consists of cleaning and descaling the existing cooling tower compartments, media hangers and hardware, hot and cold water basins, and spray nozzles; replacing worn, damaged or missing parts (spray nozzles, fan shafts, etc.); installing new cooling media; installing new fan shaft bearing kits, aluminum fan sheaves, bushings, and hardware; installing new fan motors; and installing NDOW provided isolation plates. Questions regarding the project shall be addressed in writing to: Ashley White at the above email address. All questions shall be received prior to 12:00 P.M. local time on Friday, September 22, 2023. Pursuant to the Statutes NRS 338.020 to 338.090 of the State of Nevada, the Labor Commissioner has established the minimum wage rates and rates of overtime and legal holidays in the locality in which the work is to be performed. All proposals shall be accompanied by a bid bond amounting to not less than ten percent (10%) of the bid which is payable to said Owner signed by the bidder and a corporate security, or a cashier's or certified check payable to the order of NDOW (Owner) for the said amount. Said bond shall become payable to Owner or said check shall be forfeited in case the bidder depositing the same does not, within (10) days after written notice that the Contract has been awarded to him/her: (a) enter into a Contract with the Owner, and (b) furnish certificates of insurance, a bond of faithful performance and a payment bond as described in the Contract Documents. The results of bidding will be reported by the Owner within 30 days of the bid opening, at which time the Owner may award the Contract to the lowest, responsive, and responsible bidder as so reported; however, said Owner reserves the right to reject any or all bids and to waive irregularities or informalities in any bid or in the bidding for any reason whatsoever. No bidder shall withdraw his or her bid for a period of sixty (60) calendar days after the date of the opening thereof. All bidders and their proposed subcontractors must be qualified pursuant to NRS 338.1379 or 338.1382 to bid on the contract. Additionally, all bidders and their proposed subcontractors must hold a valid license of a class corresponding to the work to be done as required by the State of Nevada's Contractor's License Law and possess any applicable business licenses in the local jurisdiction of the work. The engineer's estimate for this project is $280,000.00

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.