Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

December 9, 2023

May 14, 2024

Multiple Locations

Site Work

No Information to Display

$310,000.00

Public - City

img_map_placeholder

Multiple Locations, Batesville, MS

Subscribe to View Full Documents

Eachbidder shall be limited to threepersonnel per organization. The Project consists of rehabilitation and replacement of thesanitary sewer collection system including but not limitedto, 3,765 linear feet of 10-inchHDPE force main installation,1,606 linear feet of 8- and12-inch gravity sewer installation, 2,250 linear feet of 10- inch cured-in-place-pipe lining, manhole rehabilitation,sewer line abandonment, water line relocations, and pumpcontrol panel replacement,along with incidental and ancillary work. Bids will be received for a singleprime contract. Bids shall be ona unit price basis, with additivealternate bid items as indicatedin the Bid Form. These documentsmay be downloaded by selecting this project from the "PlanRoom" link, and by enteringQuest Project Number 8679203on the "Browse Projects" page. Addendums to the bid packagewill be issued through theGarver online Plan HoldersList; therefore, all prime bidders shall be responsible fordownloading the bid documents from the Garver online plan room in order to beincluded in the Plan HoldersList. Bidders must enter theaddenda numbers in Article3.01 of the Bid Form to verifyreceipt. The experience and qualifications of Bidders will be evaluated with the submitted bids bythe Owner. Davis Bacon Act wage rulesshall apply. All laborers andmechanics employed by contractors and subcontractors onprojects funded directly by orassisted in whole or in part byand through the Federal Government shall be paid wagesat rates not less than thoseprevailing on projects of a character similar in the locality asdetermined by the Secretary ofLabor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. TheDepartment of Labor providesall pertinent information related to compliance with laborstandards, including prevailingwage rates and instructions forreporting. For more informationplease refer to website. Sanitary SewerCollection System Rehabilitation Advertisement for Bidscompany holding a permit fromthe State of Mississippi toact as surety, or other suretyor sureties acceptable to theOwner. Bids must remain in effect for60 days after the bid openingdate. Within 60 days from thebid date, the Owner may awardthe contract to the lowest responsive, responsible bidderor reject any or all bids for theproject. Reserves the right to reject any orall bids, to waive irregularities inthe bids and bidding deemed tobe in the best interests of THECITY OF BATESVILLE, and toreject nonconforming, nonresponsive, or conditional bids.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects