Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2023

April 1, 2024

July 26, 2024

800 Carpenter Rd

Renovation

No Information to Display

$922,200.00

Public - City

img_map_placeholder

800 Carpenter Rd, Defiance, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The scope of the work consists of preparation and painting of an existing 1,000,000 gallon torospherical elevated water tower. Wet & dry interior as well as the exterior will be included. Several other items will also be repaired, re- placed and furnished and installed. The opinion of probable construction costs is $1,230,000. Proposals must be submitted on the form furnished by the City; must contain the full name of every person interested therein and shall be accompanied by a bid guarantee of a bond as required in Section 153.54 (A) of the Ohio Revised Code with a satisfactory surety or accompanied by a bid guarantee of not less than ten (10%) per cent of the amount of the proposal by a Certified Check, Cashiers Check or letter of credit pursuant to Chapter 1305 and Section 153.54 of the Ohio Revised Code on a solvent bank, subject to the conditions provided in the Notice to Bidders. The height to the high water level is 130 ft with a head range of 30 ft. Therefore, the low water level is 100 ft.. Attached is a photo ofthe nameplate for the tank for reference. The successful bidder will be required to furnish a satisfactory performance- bond. Attention of bidders is particularly called to the requirements as to condition of employment to be observed and minimum wage rates to be paid under the contract. Any bid may be withdrawn prior to the scheduled closing time for receipt of bids, but no bidder shall withdraw his bid within Sixty (60) days after the actual opening thereof. The right is reserved to reject any or all bids and to waive informalities.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects