Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 28, 2023

October 30, 2023

August 31, 2024

Multiple Locations

Site Work

No Information to Display

$57,412.00

Public - City

img_map_placeholder

Multiple Locations, Montgomery, OH

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Restoration of a roughly 120-foot section of the Gracewood Ditch, which runs between Cloverwood Drive and Gracewood Drive in Centerville. There is a 36-inch storm sewer at the upstream end of the ditch. Near the Storm outlet is a Hickenbottom style drain that collects water for the low-flow pipe in the ditch. This project will remove the Hickenbottom drain and the lowflow pipe up to the first junction. After removal, the ditch will be rechanneled and armored with rock. A catch basin will be set at the junction to serve as the new low-flow pipe inlet. Rehabbing a section of ditch through removal of brush and a low-flow pipe, rechanneling section and armoring banks with rock, and installing basing for low-flow inlet The Owner reserves the right to reject any, part of any, or all bids and to waive any informalities and irregularities. The Bidder expressly acknowledges this right of the Owner to reject any or all bids or to reject any incomplete or irregular bid. City Council acts through its City Manager or the City Manager's properly authorized agents, such agents acting severally within the scope of the particular duties entrusted to them. Engineer's Estimate: $99,830 Rehabbing a section of ditch through removal of brush and a low-flow pipe, rechanneling section and armoring banks with rock, and installing basing for low-flow inlet. Local Funding - Capital Improvement Program SS-4 Completion Date August 31, 2024 Construction limits & components: o Upstream Inlet o 36" Storm Sewer drains into Gracewood Ditch o Hickenbottom drain collects storm water to low-flow pipe o Low-flow pipe elevation too high, constantly sitting water o Removal of Hickenbottom drain and low-flow pipe o Ditch Channel o Low flow pipe from inlet to first junction o Rock Channel protection o Light clearing, trees to remain o Junction with 12" Storm o Install catch basin at junction location o Extend underdrain pipe 20' upstream

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.