Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

No Information to Display

7752 Martin Mill Pike

Site Work

No Information to Display

$625,000.00

Public - County

img_map_placeholder

7752 Martin Mill Pike, Knoxville, TN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Splash Pad French Memorial Park Prospective proposers must submit questions concerning this solicitation by September 20, 2023@ 4:30 p.m. INSTRUCTIONS, SPECIFICATIONS AND SCOPE OF WORK GENERAL REQUIREMENTS 4.1 GENERAL SCOPE: 4.1.1 Commercial Splash pad company shall design, build and install all equipment for a splash pad for Knox County Parks and Recreation (Owner). Products must comply with ADA (Americans with Disability Act). 4.1.2 This includes all equipment, labor, materials, etc. as specified herein. Freight for all parts and equipment is included in price. 4.1.3 Splash pad area will be 1600 square feet with a total area of 2500 square feet. 4.1.4 Contractor is responsible for assembly and installation of all equipment included herein in required location as shown on plans. 4.1.5 Contractor is to provide a competent, experienced foreman for management of above stated project. Foreman's resume should be included in submission. 4.1.6 Contractor shall erect the equipment at the site in full compliance with current rules and regulations of state, county and local regulations. If, because of certain job conditions, any work specified to be performed under this contract must be done by other, the Contractor shall sub-let such work to those who are qualified to do such work or make other arrangements at his own expense as approved by the Owner. Owner to be notified of changes of subcontractors and to be given qualifications of said subcontractors. As per Section 3.35, the respondent is requested to visit the site for a pre-proposal site visit. It is the contractor's responsibility to make sure all equipment and features are optimal for the location and correct equipment is supplied. Failure to attend the site visit will not alleviate a proposer from providing the splash pad as detailed herein. 4.1.8 Contractor is responsible for design and construction of the pump house. Pump house shall be no less than 15'x10'x10 and no larger than 20'x15'x10'. The building shall be fully enclosed with air vents on two sides, one exhaust fan, poured floor with drain, and double steel security doors. 4.1.9 9 Contractor is responsible for final sewer connection for drain line, pumphouse drain connection and piping to sanitary sewer line. 4.1.10 Contractor is responsible for water supply line, pressure regulator and backflow preventer (2" line w/ min. 40PSI) 4.1.11 Contractor is responsible for bringing power to contractor provided pump house. 4.1.12 Contractor will clean up all debris made by his/her workmen immediately upon completion of installation and remove same from premises. Equipment and materials are to be received at the site in clean condition and damage-free condition prior to Owner's acceptance so as everything to be in optimal working condition. 4.1.13 All of the Knox County procurement procedures apply to any and all equipment purchases by the owner. 4.1.14 The budget for this project is not to exceed $625,000.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects