Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 6, 2023

December 4, 2023

April 4, 2024

Multiple Locations

Site Work

No Information to Display

$652,650.00

Public - City

img_map_placeholder

Multiple Locations, Albany, GA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

**As of October 24, 2023, this project has not yet been awarded. Project is anticipated to be awarded mid November.** Question Deadline 09/22/2023 at 2:30 PM ET For additional information, contact Ricky Gladney, Buyer I, at (229) 431-3211. Submit all questions via email to rqladney@albanyqa.gov cc: jswilliams@albanyqa.gov and kross@albanyqa.gov. and Replies of substance will be answered in the form of an addendum and made available to all potential bidders. for all work required to rehabilitate and upgrade Well No. 19 & 24 in accordance with bid documents, specifications, and all other contract documents. Contractor may bid on one or both of the projects, the contract, bonds, and bid title shall be amended with only one of the projects listed if a single bid is placed. location 2004 Stratford Dr, Albany, Georgia 31705 (Well No. 19) 2867 Gillionville Rd, Albany, Georgia 31721 (Well No. 24). Work of the project includes improvements to the City's Well No. 19 & 24 located at 2004 Stratford Dr, Albany, Georgia 31705 (Well No. 19) and 2867 Gillionville Rd, Albany, Georgia 31721 (Well No. 24). The Contractor will mobilize and perform a pump test to determine well capacity, static water level, and pumping water level. Contractor shall pull the pump and perform a preliminary video inspection of the well; well casing & screens are to be cleaned, post cleaning video inspection completed, and pump and motor upgrades performed to meet required duty conditions. Existing pump base will be demolished and reconstructed to meet Georgia EPD minimum standards and discharge piping, valves, fittings, etc. will be replaced to match up to new pump discharge head elevation as detailed in the plans. Electrical and control improvements will also be made as detailed in the plans. All materials shall be provided by Contractor except where noted to re-use or re-build existing items on plans. Once all improvements have been completed the Contractor will be responsible for performance testing, disinfection, sampling, and laboratory testing necessary to place the well back in service.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.