Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

December 11, 2023

December 11, 2026

2501 Harbor Blvd

New Construction, Site Work

No Information to Display

$161,000,000.00

Public - State/Provincial

img_map_placeholder

2501 Harbor Blvd, Costa Mesa, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The Department of General Services, Real Estate Services Division - Project Management and Development Branch requests the submittal of qualifications from interested Design-Build Entities (DBE) to provide professional Architectural/Engineering and Construction services for the design and construction of the new Emergency Operations Center in the City of Costa Mesa, Orange County, California. The State of California Governors Office of Emergency Service will operate the new facility. The new Emergency Operations Center is located in the Southern Region for the State of California Governors Office of Emergency Services. The project must meet the requirements of the Essential Services Buildings Seismic Safety Act (ESBSSA). The project will be located on an approximately 15 acre site on the former Fairview Developmental Center property, in the City of Costa Mesa, Orange County, CA. The Fairview campus is eligible for listing of a historic district. The entire 15 acre site, other than the visitor parking area, must be enclosed with an 8-foot tall, minimum, perimeter security fence. Access to the secure area from the visitor parking area will be via a guard shack located between the guest parking area and the facilities inside the fence. The visitor and staff parking area along with the building rooftops can be utilized for the installation of photovoltaic arrays. The proposed secure facility will consist of one single story office building of approximately 34,000 sf containing office space, an emergency operations center, shared training rooms, support areas, and appurtenances, a separate warehouse building with loading docks of approximately 20,000 square feet containing a vehicle maintenance and repair bay, support spaces, appurtenances, and warehousing spaces for life-sustaining commodities. Additionally, the site will contain a 120, high microwave transmission tower, emergency generators and fuel tank including redundant facility backup, staff and visitor parking, outdoor command spaces, heliport for Blackhawk helicopters or smaller, and landscaping. Demolition and hazardous material abatement of existing structures, site work, and a new dedicated utility infrastructure are part of the scope of the project. The new utility facilities will require coordination with local utility companies for electrical, gas, cable/internet/low voltage communication, and the City and County for utilities such as storm drainage, wastewater, garbage, fire suppression, lighting, roadways for ingress/egress and water. The project will be designed and constructed for LEED silver certification at a minimum and Zero Net Energy (ZNE). All work will be performed in accordance with the Essential Services Buildings Seismic Safety Act and the Secretary of the Interiors Standards for Rehabilitation and will be subject to review by the Division of State Architect and the State Historic Preservation Officer to maintain the building as a historic resource. Submit written questions no later than 2:00 P.M., PT, September 29, 2023. Questions received after this time will not be considered. Copies of all the questions and answers will be distributed by October 6, 2023 in a written clarification document to all Design-build Entities that have officially requested the RFQ and that have attended the Mandatory RFQ Briefing Conference

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects