Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 1, 2026

No Information to Display

217 Schoenbar Rd

Outdoor Lighting, Renovation, Site Work

No Information to Display

$655,000.00

Public - City

img_map_placeholder

217 Schoenbar Rd, Ketchikan, AK

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Update:https://www.kgbak.us/DocumentCenter/View/12831/KGB-Capital-Improvement-Plan-2025-2029-FINAL The Ketchikan Gateway Borough acquired the Skate Park on Schoenbar Road from Ketchikan Youth Initiatives in 2020. This project entails construction of an approximately 6,500-s.f. wood- or steel-framed structure on existing concrete footings with metal roofing throughout. Work will include lighting and security cameras. Costs were appropriated from ARRA funding in FY2022, reappropriated for FY2023 and FY2024, with additional funds added in FY2024 from Rec CIP and CPV funds. Dawson Construction, Inc. was awarded a contract in FY2024 for the roof and a sidewalk connecting the Schoenbar Schoenbar Trail, Park Avenue, Ketchikan Creek, and the access points of the skate park, and a concrete staircase Project is included Ketchikan Gateway Borough Fiscal Year 2025-2029 Page no 54 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Ketchikan Gateway Borough acquired the Skate Park on Schoenbar Road from Ketchikan Youth Initiatives in 2020. This project entails construction of an approximately 6,500-s.f. wood- or steel-framed structure on existing concrete footings with metal roofing throughout. Work will include lighting and security cameras. Costs were appropriated from APRA funding in FY2022, reappropriated for FY2023 and FY2024, with additional funds added in FY2024 from Rec CIP and CPV funds. Work in FY2024 will include building a sidewalk to connect the Schoenbar Trail, Park Avenue, Ketchikan Creek, and the access points of the skate park, and a concrete staircase running down to Ketchikan Creek. Fiscal year 2024-2029 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.