Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 6, 2023

December 21, 2023

No Information to Display

To Be Determined

New Construction, Site Work

No Information to Display

$100,000,000.00

Public - Federal

img_map_placeholder

To Be Determined, Fort McCoy, WI

Our team is requesting plans for this project.

Subscribe to View Full Documents

The U.S. Army Corps of Engineers (USACE) - Louisville District intends to issue a Request for Proposal (RFP), Solicitation No. W912QR24R0002 for the Design-Bid-Build construction of a new 61,229 sf, 4-story, 400 bed, Transient Training Enlisted Barracks. Work includes standing seam metal roof over rigid insulation on steel deck on structural trusses, utility brick veneer over rigid insulation on steel studs with exterior glass mat gypsum sheathing, concrete floor on metal deck and on-grade, elevator, aluminum doors & windows, gypsum board & metal frame partitions, steel door frames & steel doors, acoustical ceilings, HVAC, plumbing, security, and electrical systems. Air barrier testing and HVAC silver is required. Construct Site Work to include base proposal demolition, site clearing, grading, drainage, utilities, paving, and permits, beyond a line five feet outside the Barracks Building. The project contains options such as: 1) Operations and Maintenance, Army Reserve (OMAR) Funded Laundry Equipment Items (washers and dryers); 2) Bona Fide Need Operations, Maintenance - Army Reserve (OMAR) Funded Equipment Items (metal shelving, fire extinguishers, window blinds) ; 3) Install Concrete Pavement on the Mow strips, Sidewalks including the Fire Lane and Pad for Bicycle Rack; 4) Southern Third Concrete Parking Lot; 5) Middle Third Concrete Parking Lot; and 6) Northern Third Concrete Parking Lot. The Contract Duration is 780 calendar days from Contract Award. he Government intends to award without discussions, but reserves the right to conduct discussion should it be deemed in the Government's best interest.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.