Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

December 4, 2023

December 1, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$7,077,800.00

Public - County

img_map_placeholder

Multiple Locations, San Francisco, CA

Subscribe to View Full Documents

provide redundancy to the aging pipelines of San Francisco's water distribution system. The work to be performed under this contract includes the installation of 8-inch and 12-inch ductile iron pipes, installation of curb ramps, and pavement restoration on Joost Ave from Ridgewood Ave to Congo St and various side streets. The work is to be performed in San Francisco, California. OBE - 7.77% Prospective Bidders shall familiarize themselves with the intended use of Questions Derek Wong c/o SFPUC Contract Administration Bureau 525 Golden Gate Avenue, 8th Floor San Francisco, CA 94102 Email: CAB@sfwater.org Direct: (415) 551-4549 Jovi Cuntapay-Vitin Contract Monitoring Division 30 Van Ness Avenue San Francisco, CA 94102 Direct: (415) 554-3136 jovineth.cuntapay-vitin@sfgov.org Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B and Section 2.01 of Attachment 1. The Local Business Enterprise (LBE) subcontracting requirement is 17.00%. The LBE subcontracting requirement can only be met with certified San Francisco Micro and Small-LBEs. The LBE subcontractor participation requirement for this Contract is 17.00%. The LBE sub participation requirement for this contract is below 20% due to the limitations on procurement of pipeline materials to be installed. SFPUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s). Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to Attachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Jovi Cuntapay-Vitin at (415) 554-3136 or jovineth.cuntapay-vitin@sfgov.org for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: trucking, hauling, shoring, pavement restoration and renovation, saw cutting, and traffic control. A Class "A" California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing

34 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects