Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

June 30, 2025

26470 Shirley Lk Dr

New Construction, Site Work

No Information to Display

$793,000.00

Public - City

img_map_placeholder

26470 Shirley Lk Dr, Willow, AK

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

The Matanuska-Susitna Borough (MSB) requests professional Civil and General Contractors to quote the tree clearing, grading, and training pit relocation at Station 12-5, located at 26470 W. Shirley Lake Dr. Willow, AK 99688. The added area will be 40 feet x 120 feet (4,800 SF) and is an extension of the existing gravel training pad. This pad is located east of the new underground water tank installed in 2023. The Matanuska-Susitna Borough is requesting bids from qualified contractors to design & build site work improvements at station 12-5. Work to be performed includes the Fire Gravel Training Pad with a training pit at one end, Develop and build curb and paving at the existing water tank area. (see pictures) and Relocate Storage containers from Station 12-1 in Willow on the Parks Hwy to the Shirley Lake Station 12-5, set and build a manufactured truss roof over these units with a metal roof. Questions Due Date: Sep 18th 2023, 5:00 PM AKDT For more information call (907) 861-8601 or e-mail purchasing@matsugov.us. The Matanuska-Susitna Borough (MSB) requests qualified contractors to design and build: 1) Fire Gravel Training Pad with a training pit at one end. 2) Develop and build curb and paving at the existing water tank area. (see pictures) 3) Relocate Storage containers from Station 12-1 in Willow on the Parks Hwy to the Shirley Lake Station 12-5, set and build a manufactured truss roof over these units with a metal roof. 1) The Gravel Training Pad will be located east of the water tank road end and start at the existing tree line and run 120 feet east and 180 feet south and include a training pit on the south end that is approximately 30 feet wide, 60 feet long and 12 feet deep. The material coming out of this pit will be used to extend the water truck road providing a ramp type slope down to the gravel pit area. 2) The concrete curb will be built along the line of the existing yellow bollards closest to the tank equipment shed that defines the south side of the new truck roadway. The new paving will be from this curbing and top the existing new gravel road and will be 16 feet wide and approximately 90 feet long. 3) The proposal will show the location of two storage containers for a pre-manufactured truss roof system over two 40 foot storage units on the gravel pad. The location to be on the northern end of the pad just down from the water tank road east west run. The roof truss system must span 24 feet clear between the storage units and span over each 8 foot wide storage unit for a total length of about 40 feet. The metal roof color is to match the 12-5 station warm storage building. The truss pitch to be 5 / 12.

58 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects