Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 5, 2023

November 6, 2023

July 29, 2024

4237 Colfax Ave S

Renovation

No Information to Display

$623,200.00

Public - City

img_map_placeholder

4237 Colfax Ave S, Minneapolis, MN

Subscribe to View Full Documents

A. General: 1. This Contract shall include General Construction Work, including mechanical and electrical work, required to construct the 2024 Barton Elementary School Chiller Replacement project, 4237 Colfax Avenue South, Minneapolis, Minnesota 55409 for Minneapolis Public Schools, Special School District No. 1, Minneapolis, MN, as shown on the Contract Drawings and described in the Project Manual, dated September 1,2023, prepared by Wold Architects and Engineers, 332 Minnesota Street, Suite W2000, Saint Paul, Minnesota 55101. B. Summary by References: 1. Work of the Contract can be summarized by references to the Contract, General Conditions, Supplementary Conditions, Specification Sections, Drawings, addenda, and modifications to the Contract Documents issued subsequent to the initial printing of this Project Manual and including but not necessarily limited to printed material referenced by any of these. It is recognized that work of the Contract is also unavoidably affected or influenced by governing regulations, natural phenomenon including weather conditions, and other forces outside the Contract Documents. C. Contract: 1. Construct Work under one prime contract. 2024 Barton Elementary School Chiller Replacement Placement of new chiller provided by owner, associated transformer and electrical work, and replacement of adjacent roofing area.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects