Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 15, 2023

October 16, 2023

August 1, 2024

Multiple Locations

Site Work

No Information to Display

$829,739.00

Public - County

img_map_placeholder

Multiple Locations, Vancouver, WA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The project includes the following work: Assessing the materials of service lines for approximately 6,620 water meters on both the Owner and Customer sides. Meters will be specified by the Owner. All assessments must be completed by Aug 1, 2024. Assess meters installed prior to 1987 to include all individual meters and 20% of subdivision meters randomly selected by the Owner. Contractor must furnish all supervision, labor, tools, and equipment necessary to inspect the services to vacuum excavate and test the materials. The Engineer's Estimate for this project is $852,500.00, plus applicable WA State Sales Tax. Bidder shall submit with its bid either an original surety company bid bond on the form provided by the Owner, or a cashier's or certified check payable to the order of Clark Public Utilities, in an amount not less than five percent (5%) of the total amount of the Bid that could be awarded including any Additives and Alternates and excluding sales tax. Bids not accompanied by an appropriate bid guaranty may be rejected as non-responsive. Questions about this project should be directed to the following individual. Depending on the nature of the question, the Utility may require the Bidder to put a question in writing. Contact Person, Title: Cathy Wannamaker, Materials Manager Phone Number: 360-992-8834 E-mail Address: cwannamaker@clarkpud.com Owner assumes no responsibility for any conclusions or interpretations made by Bidder based on the information made available by Owner. Should a Bidder find conflicts, errors, discrepancies, or omissions in the Drawings or Specifications, or should Bidder be in doubt as to their meaning or interpretation, Bidder shall at once notify the Owner in writing. At the Owner's discretion, questions received less than five (5) calendar days before the bid submission deadline may not be answered. If appropriate, Owner will send explanations, interpretations, or modifications to all bidders by written addenda. Oral explanations and interpretations by the Owner shall not be binding. All addenda issued shall be incorporated into the Contract Documents. At its sole discretion, Clark Public Utilities reserves the right to reject any or all bids, and to waive as an informality any immaterial irregularities in the bids received. Within ten (10) calendar days after the notice of award date, Bidder shall submit two (2) signed originals of the Contract (see Appendix A); certificate of insurance and endorsements as required in the Contract Documents; and separate Payment and Performance Bonds, each for 100% of the Contract Award Amount plus Washington State Sales Tax

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.