Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2023

June 1, 2024

August 1, 2024

2221 28th Ave

Renovation

No Information to Display

$700,500.00

Public - County

img_map_placeholder

2221 28th Ave, Greeley, CO

Subscribe to View Full Documents

Reference Number 0000329321 The scope of work includes the replacement of 26 existing gas fired, DX cooling RTU's, addition of evaporative cooling and other modifications as needed to the gym heating and ventilation unit, RTU-23. New controls through the BAS. Electrical updates for RTU replacement and addition of evaporative cooling. Question Acceptance Deadline 09/12/2023 at 5:00 PM MT Questions are submitted online No all questions shall be directed to the Architect (mpeer@dlrgroup.com). General Contractor - A Labor and Material payment Bond 100% of project cost; Bid security shall be submitted with each bid in the amount of 10 percent of the bid amount. No bids may be withdrawn for a period of 60 days after opening of bids. Work is subject to liquidated damages of $1000/day. Bidders shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Final Completion of the Contract date of August 01, 2024. *Owner reserves the right to reject any and all bids and to waive informalities and irregularities.

45 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.