Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 12, 2023

November 13, 2023

December 31, 2023

4319 Laporte Ave

Renovation

No Information to Display

$450,000.00

Public - City

img_map_placeholder

4319 Laporte Ave, Fort Collins, CO

Subscribe to View Full Documents

Reference Number 0000329317 Platte River seeks a contractor to design, manufacture, remove and install a 480 VAC switchgear located at its Soldier Canyon Pump Station. The removal of the old switchgear and installation of the new switchgear will need to be performed by the contractor or subcontracted out. Platte River will arrange an outage for the pre-bid meeting to take place so contractors can take the necessary measurements to design and manufacture the new 480 VAC switchgear. Once the contract has been awarded, another outage will be scheduled for the contractor to review its design. The delivery of the new 480 VAC switchgear to the Soldier Canyon Pump Station site would ideally be no later than November 6, 2023. A final outage will be scheduled for the removal and installation of the 480 VAC switchgear and the Work would ideally be complete and in service by December 31, 2023. If this schedule is not a realistic timeframe for vendors, Platte River will accept the review of proposed alternate delivery date and Work completion dates provided with proposals. Question Acceptance Deadline 09/27/2023 at 3:00 PM MT Questions are submitted online Yes the project scope and answer questions relating to the project. If attending, please send an email to ContractAdmin@prpa.org Answers emailed to bidders on or about: Wednesday, October 4, 2023 General Requirements - Bid Deposit Required - FOB Destination - Insurance Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % *Platte River reserves the right to reject any or all bids. Bid proposals may not be altered, withdrawn, or resubmitted for 90 days after the bid submission deadline.

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects