Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2023

October 19, 2023

November 16, 2023

Multiple Locations

Site Work

No Information to Display

$338,000.00

Public - County

img_map_placeholder

Multiple Locations, Omaha, NE

Subscribe to View Full Documents

Mobilization 8" PVC SDR 26 Sanitary Sewer Pipe W/ Class I Bedding, In Place 8" x 8" PVC Wye, In Place 8" I.D. PVC Slant, In Place 54" I.D. Sanitary Sewer Manhole, In Place Standard Ring and Cover, In Place Tap Existing Sanitary Sewer Concrete Manhole Ring Geotextile Fabric, Unstable Trench, If Necessary 10 Crushed Rock, Unstable Trench, If Necessary 11 8" I.D. PVC Sanitary Sewer Drop Connection, In place ESTIMATED QUANTITIES 1 L.S. L.F. 3050 2 EA. 4 EA. 150 V.F. 11 EA. 1 EA. 9 EA. 950 S.Y. 260 TON 1 EA. INDUSTRIAL SANITARY SEWER LOT 1. At such hour, or as soon as practicable thereafter, the Board of Trustees of the District will proceed to open in the presence of all bidders and consider the bids received for the furnishing of such labor, materials, and equipment necessary for the proper construction of such improvements. The extent of the work consists of the construction or other effectuation of the items listed below and other related preparatory and subsidiary work from issuance of the Notice to Proceed The Engineer's estimate of the construction or other effectuation of all such improvements is $360,000.00. All work called for in the drawings and specifications shall be furnished in strict accordance with the drawings and specifications prepared by Thompson, Dreessen & Dorner, Inc., Engineers for the District, and now filed in the office of the Clerk of the District at 11440 West Center Road Omaha, NE 68114, and bid Each bid must be accompanied in a SEPARATE SEALED ENVELOPE by a certified check drawn on a bank whose deposits are insured by the Federal Deposit Insurance Corporation in the amount of $18,000.00, payable without condition to the Treasurer, Sanitary and Improvement District No. 374 of Sarpy County, Nebraska, or a bid bond for a like amount as evidence of good faith of the bidder and as agreed upon liquidated damages to the District in the event the bidder whose proposal is accepted by the Board of Trustees of the District fails to enter into contract within ten (10) days after Notice of Award and furnish acceptable bond to complete the work and pay for all labor done and materials used, such bond to be in the amount of 100% of the total bid price. No bidder may withdraw his proposal for a period of thirty (30) days after the date set for the opening of bids.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects