Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2023

November 27, 2023

September 27, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$2,873,838.00

Public - City

img_map_placeholder

Multiple Locations, West Saint Paul, MN

Subscribe to View Full Documents

**As of October 26, 2023, project was awarded to Meyer Contracting, Inc.,, awarded amount is $2,873,837.71** Lift Station No. 4 Improvements & Lift Station No. 4 Forcemain Replacement West St. Paul, MN 1. Lift Station No. 4 Improvements: (a) Removal of existing lift station equipment, controls, piping, a portion of the existing wet well/dry well structure. (b) Furnish and install new precast concrete grinder manhole, wet well, valve vault, pumps, grinder, magnetic flow meter, piping, valves, etc. (c) Furnish and install new control panel, permanent generator, and roof shelter structure to cover this equipment. (d) Lift Station will remain in service during improvements. All temporary bypass pumping of sewage required for the changeover is the responsibility of the Contractor and shall be coordinated with the City. (e) Contractor must bring the Lift Station site up to grade, compact the site, and prepare the site for final restoration and paving. Imported material is required for fill/backfill in some areas due to organic soils present at the site. See plans for details. 2. Lift Station No. 4 Forcemain Replacement: (a) 2,200 LF Slip-Line 10" CIP with 8" DR 11 HDPE, 2500 LF Pipe Burst 10" CIP with 8" DR 11 HDPE, 13 EA Pipe Lining/Bursting Access Pit, XXX (LF) 8" DIP Forcemain, XX Sanitary Manholes, XXX (TONS) Bituminous Paving

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects