Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2023

April 29, 2024

No Information to Display

114 Wilber Ln

Site Work

No Information to Display

$225,000.00

Public - State/Provincial

img_map_placeholder

114 Wilber Ln, Speculator, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

OPWDD is soliciting quotes from responsible and qualified MWBE, SDVOB or NYS small business contractors to provide sidewalk leveling and repairs to the sidewalks at 114 Wilber Lane for Sunmount DDSO. Please see scope for details. OPWDD intends to award the proposal to the most responsible and responsive business that provides the lowest cost. Service-Disabled Veteran-Owned Set Aside: No Contract term: 1 year County(ies): All NYS counties Location: 114 Wilber Lane Speculator, NY 12164 Business entities awarded an identical or substantially similar procurement contract within the past five years: None Sidewalk leveling and repair. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid and Certified Payrolls must be submitted at time of completion. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of sidewalk leveling and repair, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent or his/her representative A site visit has been scheduled for Wednesday, September 13, 2023, for exact measurements of the jobsite. If you cannot attend on above date, please call and accommodations will be made, if possible, for an alternate date. Please call (518)-359-7706 to schedule a time at the project site. All questions or requests for information shall be submitted, in writing to Mark.g.woods@opwdd.ny.gov. *There were no bidders on this project. *

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects