Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 19, 2023

November 20, 2023

No Information to Display

Multiple Locations

Renovation

No Information to Display

$3,829,500.00

Public - City

img_map_placeholder

Multiple Locations, Virginia Beach, VA

Subscribe to View Full Documents

Replacement of the building digital direct control system (DDC) for Building 10. Replacement will require modification to existing air handling units, replacement of terminal air conditioning units, and a new DDC front end and operator workstation. The project replaces approximately 239 parallel fan powered VAV boxes, 104 single duct VAV boxes, 14 fan coil units, and controllers for 6 air handling units. The Contractor is required to furnish to the Engineer, on a weekly basis at the project's progress meetings, a 3-week look ahead schedule. The schedule must show planned activities in sufficient detail to allow proper monitoring of the planned construction activities. The City of Virginia Beach, Virginia will receive sealed bids for the furnishing of all equipment, labor and material, and the performing of all work for the above described project. The Bidder shall include in its bid or proposal its identification number issued by the Virginia State Corporation Commission or a statement describing why it is not required to be so authorized to transact business in the Commonwealth. The work includes the Replacement of the building digital direct control system (DDC) for Building 10. Replacement will require modification to existing air handling units, replacement of terminal air conditioning units, and a new DDC front end and operator workstation. The project replaces approximately 239 parallel fan powered VAV boxes, 104 single duct VAV boxes, 14 fan coil units, and controllers for 6 air handling units.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects