Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2023

October 27, 2023

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$2,900,683.00

Public - City

img_map_placeholder

Multiple Locations, Antioch, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of Antioch is requesting bids for a three-year (3) contract with an option to extend two (2) additional years at the Citys sole discretion for the complete repair to areas in the roadway that have previously been damaged due to sanitary sewer or water distribution repairs (Service Cuts). The contractor will be required to remove all of the spoil to the specified depth and replace it with1/2 inch Type A asphalt. Questions relating to specifications or technical questions must be submitted via email to Bryan Pitts at bpitts@antiochca.gov Technical questions or requests shall be submitted no later than September 13, 2023, and will be answered by September 20, 2023. SCOPE OF WORK The City of Antioch is requesting bids for a three-year (3) contract with an option to extend two (2) additional years at the City's sole discretion for the complete repair to areas in the roadway that have previously been damaged due to sanitary sewer or water distribution repairs(Service Cuts). The contractor will be required to remove all of the spoil to the specified depth and replace it with 1/2 inch Type A asphalt. Work from the City provided Service Cuts List must be fully completed within 120 days of the date on the issued P.O. or the contractor is subject to liquidated damages specified in section 25 of General Conditions and agrees to reduce the price of the unfinished service cuts by 10%. A new Service Cuts List and P.O. will be provided on July 1, of every subsequent contract year. Work must be fully completed within 120 days of receiving the new fiscal year P.O. and new service cuts list. Work must begin within 15 days of the date on the Issued P.O. If the contractor does not work in a safe, productive, and efficient manner as deemed by the City's representative then the City may elect to move to the next responsible bidder. This decision will be up to the sole discretion of the City. Additional time will be allowed if additional work is added

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.