Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2023

October 20, 2023

No Information to Display

501 3rd St SW

Outdoor Lighting, Site Work

No Information to Display

$456,400.00

Public - City

img_map_placeholder

501 3rd St SW, Mandan, ND

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Electrical Contract for new baseball field lighting at the Veterans Memorial Ballpark in Mandan, North Dakota as described in the Contract Documents as prepared by Prairie Engineering, P.C., Bismarck, North Dakota, Engineer. Electrical work will consist of removing existing pole structures, luminaires and associated transformers, retrofitting two existing metal sports lighting poles with new LED luminaires, and providing four new sports lighting poles with LED luminaires. The system will provide for wireless on/off control of the system. One additional site pole with three luminaire heads will also be provided for security lighting. The Owner reserves the right to waive any informalities and to accept or reject any or all Bids. Each Bid must be accompanied by a separate envelope containing a Bidder's Bond in a sum equal to five percent of the full amount of the Bid, executed by the Bidder as Principal and by a Surety Company authorized to do business in this State, conditioned that if the Principal's Bid be accepted and the Contract awarded to the Principal, the Principal, within ten days after notice of award, will execute and effect a Contract in accordance with the terms of the Principal's Bid and a Contractor's Bond as required by law and the regulations and determinations of the governing board.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.