Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2023

November 20, 2023

June 17, 2024

Multiple Locations

Site Work

No Information to Display

$2,700,000.00

Public - City

img_map_placeholder

Multiple Locations, Jasper, TX

Subscribe to View Full Documents

It is the Intent and Purpose of These Contract Documents to Provide for Improvements to the Existing Sanitary Sewer Collection System. Contractor to Perform All Work as Indicated. This Project Will Be Funded by Twdb. This Contract Shall Provide for the Necessary Labor, Equipment, Tools, Materials, and All Other Related Construction for the Proposed Project. SUMMARY OF WORK The Contractor shall rehabilitate approximately 12,947 linear feet of 6 inch diameter sanitary sewer line by pipe bursting with 8 inch DR-11 (Class 160) HDPE sewer line, all in accordance with the plans and specifications. The Contractor shall rehabilitate approximately 7,264 linear feet of 8 inch diameter sanitary sewer line by pipe bursting with 10 inch DR-11 (Class 160) HDPE, all in accordance with the plans and specifications. The Contractor shall provide all bypass pumping as directed by the Engineer. The Contractor shall remove and replace 43 manholes as shown on plans and per details. The Contractor shall install 2 new manholes as shown on plans and per details. The Contractor shall remove all existing 6 inch sanitary sewer cleanouts and install a new 48 inch fiberglass manhole at the end of the line, all in accordance with the plans and specifications. The Contractor shall conduct pre and post installation TV inspection of the sewer lines, all in accordance with the plans and specifications. Each proposal shall be accompanied by a bid guarantee of not less than 5% of the total bid amount, as a guarantee that the bidder will enter into a contract and execute the required bonds within ten days after notice of award. The successful bidder must furnish Performance Bond and Payment Bond on the forms provided in the amount of one hundred percent (100%) of the total contract price from a Surety or other Sureties acceptable to the Owner. For additional information on Davis-Bacon Wage Rate Requirements and its applicability to this contract, please consult TWDB All questions regarding Davis-Bacon guidance can be directed to: U.S. Department of Labor Wage and Hour Division1-866-4USWAGE (1-866-487-9243), TTY: 1-877-889-5627, Monday-Friday 8 a.m. to 8 p.m. Eastern Time.

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.